At each switch, confirm the handoff
Ask what happens to unfinished work, what the next assignment involves and who knows about the change. Record the switch when safely stopped and within site rules. Approximate times should be marked approximate rather than presented as exact.
If you return to picking later, record the return as another work block. Keep the earlier completed quantity in the same personal timeline without entering the same work twice.
Keep different work units separate
Cases picked, pallets loaded and areas cleaned are different observations. Do not add them together as a combined picking quantity. Leave picking-rate fields blank for non-picking work and use a brief task description where appropriate.
If your employer uses activity codes or another recording process, follow that process too. A personal note does not clock you into a different payroll category or change a company performance report.
A worked example: the same day, two raw rates
This hypothetical six-hour day includes four picking hours, one loading hour, half an hour of cleaning and half an hour of breaks. The completed picking quantity is 800 cases.
| Time | Assignment | Duration | Cases picked |
|---|---|---|---|
| 7:00–10:00 | Picking | 3 hours | 600 |
| 10:00–10:15 | Break | 15 minutes | — |
| 10:15–11:15 | Loading | 1 hour | — |
| 11:15–12:15 | Picking | 1 hour | 200 |
| 12:15–12:30 | Break | 15 minutes | — |
| 12:30–13:00 | Cleaning | 30 minutes | — |
- Picking-time view: 800 ÷ 4 = 200 cases per picking hour.
- Whole-shift elapsed view: 800 ÷ 6 ≈ 133.3 cases per elapsed hour.
Both calculations describe their stated assumptions. Neither establishes the employer's score or says how well the loading and cleaning were done. The free calculator can check raw totals; it cannot decide which minutes your workplace approves for exclusion.
Reconcile the time before comparing
Keep picking, other assignments and breaks distinguishable. Count overlapping time once. If you were waiting while a break was already running, those same minutes are not two separate deductions.
Add completed picking quantities and counted picking hours before dividing. Do not simply average the rates from two blocks of different lengths. See why rate numbers differ when another report covers a different window or score type.
Bring a specific question to a review
Instead of “my rate dropped,” ask: “This period includes a move from picking to loading and back. Which work and hours does this report include?” Bring the timeline through the site's normal review process and keep the original times alongside any confirmed correction.
These examples are personal arithmetic. My Pick Rate does not read your warehouse system; record the assignment changes in your own notes rather than assuming they have been detected automatically.